LASCO/EIT Operations Status
Daily Reports -- December 1996

31-Dec-1996 (C1-C2-C3-EIT synoptic)

30-Dec-1996 (C1-C2-C3-EIT synoptic)

29-Dec-1996 (C1-C2-C3-EIT synoptic; LEB problem)

	<09:00 UT LEB hung; flush at 15:20 successful;
		resumed schedule at 17:00

28-Dec-1996 (FeXIV-C2-C3-195 high rate sequence completes)
   
	16:02 - 19:11 EIT 304 Sun Center ~60 sec cadence
	20:41 - 21:49 EIT 195 Sun Center ~60 sec cadence
        22:30 transition to Submode 1 (Low Rate)
	22:40 uplinked l_set_lobt 
        23:00 transition to Submode 3 (Low Rate)

27-Dec-1996 (FeXIV-C2-C3-195 high rate sequence; TM Submode 2)

26-Dec-1996 (FeXIV-C2-C3-195 high rate sequence; TM Submode 2)

25-Dec-1996 (FeXIV-C2-C3-195 high rate sequence; TM Submode 2)

24-Dec-1996 (FeXIV-C2-C3-195 high rate sequence; TM Submode 2)

23-Dec-1996 (FeXIV-C2-C3-195 high rate sequence; TM Submode 2; Comet SOHO-6)

	S. Stezelberger discovers YA sungrazer in C3/C2

22-Dec-1996 (begin Telemetry Submode 2 at 01:00)

21-Dec-1996 (C1-C2-C3-EIT synoptic)

20-Dec-1996 (C1-C2-C3-EIT synoptic; onboard schedule problem)

	Omission of IP tables from REBOOT configuration led to
		onboard schedule problem after ~09:30 UT
	(i.e. C1 summed images were not summed but sent down individually) 

19-Dec-1996 (C1-C2-C3-EIT synoptic; EIT mini-bakeout; LEB REBOOT)

	EIT CCD ~4 hour bakeout: 13:05-15:49 UT
	19:15 LEB detected voltage out-of-range; doors closed
		LEB power cycled at ~19:30 UT

18-Dec-1996 (C1-C2-C3-EIT synoptic)

	NRT testing of FP check&correct LADS screen

17-Dec-1996 (C1-C2-C3-EIT synoptic)

16-Dec-1996 (C1-C2-C3-EIT synoptic)

15-Dec-1996 (C1-C2-C3-EIT synoptic; Sungrazing Comet SOHO-5)

	D. Biesecker and D. Lewis (U Birmingham) discover 
		SOHO-5 in 11-Dec-1996 C3 observations

14-Dec-1996 (C1-C2-C3-EIT synoptic)

13-Dec-1996 (C1-C2-C3-EIT synoptic; Sungrazing Comet SOHO-4)

	S. Stezelberger discovers SOHO-4 in C3 data

12-Dec-1996 (C1-C2-C3-EIT synoptic)

11-Dec-1996 (C1-C2-C3-EIT synoptic; TM subformat-2 test)

	13:05-17:04 UT second successful test of LASCO/EIT High Rate TM

10-Dec-1996 (C1-C2-C3-EIT synoptic)

09-Dec-1996 (C1-C2-C3-EIT synoptic)

	18:22 UT J.M. Defise tests, followed by cals

08-Dec-1996 (C1-C2-C3-EIT synoptic)

07-Dec-1996 (C1-C2-C3-EIT synoptic)

06-Dec-1996 (C1-C2-C3-EIT synoptic)

05-Dec-1996 (C1-C2-C3-EIT synoptic; TM subformat-3 test)

	13:00-16:30 TM subformat-3 test (CDS high rate)
	EIT zones set points to 100 at 13:33 UT 

04-Dec-1996 (C1-C2-C3-EIT synoptic; TM subformat-2 test)

	18:30-22:30 Successful test of LASCO/EIT High Rate TM

03-Dec-1996 (C1-C2-C3-EIT synoptic; C3 color cal)

	Full set of ff-fr C3 colors for comet focus calibration
	EIT zone heater set points to 102, then 103 
		(Alg ON, Deriv FALSE, 5, 2, 0)

02-Dec-1996 (C1-C2-C3-EIT synoptic)

	EIT standard Dark, Light Leak images ~19:15-19:50 UT
	EIT zone heater set points to 101 at 20:58 UT 
		(Alg ON, Deriv FALSE, 5, 2, 0)

01-Dec-1996 (C1-C2-C3-EIT synoptic)


