LASCO/EIT Operations Status Daily Reports -- January 1996 31-Jan-1996 (further C1 commissioning) 30-Jan-1996 (further C1 commissioning) 29-Jan-1996 (M1 MOVEMENT; C1 DOOR OPEN; C1 FIRST LIGHT) 21:21 open C1 aperture door 28-Jan-1996 (C2 color, polarized brightness sequences) 27-Jan-1996 (IOCS MOVEMENT) 19:04 resume IOCS movement 26-Jan-1996 (COB LEG MOVEMENT; EIT sector wheel checkout) 00:16 resume COB leg movements 18:57 EIT sector wheel rate testing 25-Jan-1996 (IOCS MOVEMENT) 22:58 UT begin opening coronagraph aperture doors 23:20 resume IOCS movement 24-Jan-1996 (C2 Commissioning; IOCS MOVEMENT; COB MOVEMENT; maneuver) 16:12 UT continue IOCS movement, lens exposures 17:18 COB LEG MOVEMENTS (through 18:47) 20:37 begin closing coronagraph doors for UVCS roll, maneuver 23-Jan-1996 (LEB REBOOT; C2 COMMISSIONING; IOCS MOVEMENT) 02:21 UT LEB power cycled after FP/C1 port A commanding 18:56 begin C2 IOCS occulter movement (through 21:34) 22-Jan-1996 21-Jan-1996 (LEB REBOOT; FP Finesse Opt) 16:44 LEB REBOOT by FOT (to clear possible FP error) 21:38 UT FP Finesse Opt 20-Jan-1996 (LEB REBOOT; FP Finesse Opt) 19:12 Alerts indicates illegal operations trap 19:42 LEB REBOOT ~21:47 UT Finesse Opt in FP 19-Jan-1996 (FP commanding; EIT htr. zones set to 102) 18-Jan-1996 (FP commanding; EIT htr. zones set to 94) 17-Jan-1996 recovered from 16 January 1996 REBOOT 16-Jan-1996 (C1 camera REBOOT; LEB REBOOT) 13:32 C1 Periph Msg #30 and "User stack" errors 13:41 REBOOT C1 from OBE 22:23 (approx.) FOT sent l_cycle_pwr_auto.prc (to clear stack overflow error) 15-Jan-1996 (EIT "second light") 14-Jan-1996 22:29 OBE Serious Error: Overflow (during C3/EIT cmds.) "User stack has overflowed into critical area" 13-Jan-1996 12-Jan-1996 11-Jan-1996 (C3 and FP testing) 22:51 FP noise measurement 10-Jan-1996 (C3 images, ADCT; LEB REBOOT) C3 ADCT caused divide-by-zero trap 21:20 LEB power cycled 09-Jan-1996 (C3 images; ESR test!; C1 camera REBOOT) C3 images in various filters; try to image Comet Hale-Bopp (in C3 field of view at this time, but too dim to detect) 22:36 test of Flush Queue with C3 shutter open (successful) 22:45 esrchk.sce transmitted (all doors indicate "F" motion) 22:53 Periph Msg #30; Reset Cam1 and REBOOT C1 from OBE (did not seem to work completely) 08-Jan-1996 07-Jan-1996 06-Jan-1996 (COB LEG MOVEMENTS; FP) 17:11 UT begin COB leg movements (to re-center C1 OCCs for FP checkout) 17:49 FP startup (finesse opt, central ap. scans?) (finesse opt failed repeatedly) 05-Jan-1996 04-Jan-1996 03-Jan-1996 (super-close all 4 telescope doors) 02-Jan-1996 (EIT door open; EIT FIRST LIGHT) 18:44 EIT aperture door open 18:46 begin EIT Take Normal Image tests (ff and quadrants) 19:42 EIT door closed 01-Jan-1996