LASCO/EIT Operations Status Daily Reports -- January 1997 31-Jan-1997 (C1-C2-C3-EIT synoptic) 30-Jan-1997 (C1-C2-C3-EIT synoptic) 29-Jan-1997 (C1-C2-C3-EIT synoptic) 28-Jan-1997 (C1-C2-C3-EIT synoptic; SOHO-7 discovered) D. Biesecker discovers sungrazer in 26-Jan-1997 C3 images 27-Jan-1997 (C1-C2-C3-EIT synoptic) 26-Jan-1997 (C1-C2-C3-EIT synoptic) 25-Jan-1997 (C1-C2-C3-EIT synoptic; C1 cam REBOOTed) 18:08 C1 periph error message #30 on flush; REBOOTed CAM 1 24-Jan-1997 (C1-C2-C3-EIT synoptic; C2-mod-eq begins) C2 equatorial fov increased to 1024x768 23-Jan-1997 (C1-C2-C3-EIT synoptic) C1 line scans deleted from synoptic plan 22-Jan-1997 (C1-C2-C3-EIT synoptic) 21-Jan-1997 (C1-C2-C3-EIT synoptic) 20-Jan-1997 (C1-C2-C3-EIT synoptic) ICE V13 upload 17:00 UT EIT zone set point adjusted to 101 19-Jan-1997 (C1-C2-C3-EIT synoptic) 03:22 UT EIT 304A exposures in NRT for Jupiter obs. attempt 18-Jan-1997 (C1-C2-C3-EIT synoptic) Jupiter visible in C1 synoptic field of view 17-Jan-1997 (C1 door-open cals; C2-C3-EIT synoptic) C1 door-open calibrations end 02:41 UT Jupiter visible in C2 field of view C1 normal observations resumed 16-Jan-1997 (C1 door-open cals; C2-C3-EIT synoptic) C1 door-open calibrations commenced 00:35 UT 15-Jan-1997 (C1 door-closed cals; C2-C3-EIT synoptic; LEB REBOOT) Completed C1 door-closed cals LASCO aperture doors opened 18:21-18:35 UT ICE-TCE timeout error ~22:10 (possible EIT sector wheel?) LEB power cycled 22:33 UT 14-Jan-1997 (C1 cam error msg; LASCO doors closed; C1 cals; EIT synoptic) 00:40 C1 peripheral error message #30 after flush Recovery appeared successful via 09Oct1996 method 00:50-00:55 UT C2 and C3 doors closed prior to momentum management 01:15 Resume C1 door-closed cals 13-Jan-1997 (C1-C2-C3-EIT synoptic; C1 door closed) 21:06 C1 door closed to begin calibrations 12-Jan-1997 (C1-C2-C3-EIT synoptic) 11-Jan-1997 (C1-C2-C3-EIT synoptic) 10-Jan-1997 (C1-C2-C3-EIT synoptic; end EIT CCD bakeout) EIT CCD heater powered down 10:03 UT EIT solar observations resumed ~20:30 09-Jan-1997 (C1-C2-C3 synoptic; EIT CCD bakeout; LASCO thermal testing) Juptier visible in C3 field of view All thermal zones returned to previous settings (110,5,2,0) 08-Jan-1997 (C1-C2-C3 synoptic; EIT CCD bakeout; LASCO thermal testing) 17:08 Continued series of tests for LASCO thermal zone control New settings for Zones 3, 4 & 5 (SP=90, 62, 62, ALG ON) 07-Jan-1997 (C1-C2-C3 synoptic; EIT CCD bakeout; LASCO thermal testing) 19:13 UT Began series of tests for LASCO thermal zone control New settings for Zones 4 & 5 (SP=78, ALG=ON, PID=1,0,0) 06-Jan-1997 (C1-C2-C3 synoptic; EIT CCD bakeout) Nominal TM transition (Submode 3 to Submode 1) at ~16:00 UT 05-Jan-1997 (C1-C2-C3 synoptic; EIT CCD bakeout) 04-Jan-1997 (C1-C2-C3 synoptic; EIT CCD bakeout) EIT Temp #1 exceeded YH limit ~08:00 UT; probably caused by CCD bakeout near perihelion. 03-Jan-1997 (C1-C2-C3-EIT synoptic; EIT CCD bakeout begins) EIT CCD heaters turned on ~20:45 UT 02-Jan-1997 (C1-C2-C3-EIT synoptic) 01-Jan-1997 (C1-C2-C3-EIT synoptic)